Safety case & program alignment
+72.0% KSI rate post-COVID — Walnut Creek's severity crisis requires urgent intervention
Walnut Creek’s KSI rate shifted from 4.47% (2015–19) to 7.69% (2021–25) — a +72.0% increase. Volume fell but each crash is significantly more likely to kill or severely injure — a severity crisis, not a volume crisis. 70 post-COVID KSI across 77 HIN corridors demand immediate targeted investment.
CCTSAP 2024 countywide action plan — Walnut Creek-specific appendix available for adoption
CCTA adopted the Countywide Comprehensive Transportation Safety Action Plan (CCTSAP 2024) — a USDOT-eligible action plan covering all Contra Costa cities including Walnut Creek. The CCTSAP includes a city-specific appendix for Walnut Creek. Upon local adoption resolution and completion of the USDOT Self-Certification Worksheet, Walnut Creek can apply for a FY2026 SS4A Implementation Grant targeting $5–12M federal.
22
Fatalities
city streets
77
HIN corridors
identified
CCTSAP 2024
Countywide
action plan
Project breakdown by category (2021–2025 crash data)
| Category | Projects | Cost Est. | Focus locations |
| HIN Intersections |
4 |
$2.2M |
YGNACIO VALLEY RD & OAK G, YGNACIO VALLEY RD & WALNU — ranked by 2021–25 KSI |
| Corridor Programs |
3 |
$6.7M |
YGNACIO VALLEY RD, TREAT BL, N MAIN ST — LPI + lighting + raised median |
| Citywide Programs |
4 |
$1.9M |
LPI+APS rollout, LED intersection lighting, speed feedback DUI enforcement |
⚡ Two-step path: Adopt CCTSAP appendix + complete Self-Certification Worksheet
Step 1: City Council adopts Walnut Creek-specific CCTSAP appendix (available from CCTA). Step 2: Complete USDOT Self-Certification Worksheet confirming CCTSAP satisfies all required action plan components. If confirmed → submit FY2026 Implementation Grant by May 26, 2026. Contact CCTA for the Walnut Creek appendix and eligibility guidance. Recommend pre-application USDOT review (due April 24, 2026).
Priority SS4A projects — 2021–2025 crash data
Tier 1 — Fatal & high-KSI corridors (2021–2025)
| Location | KSI | Fatal | Countermeasures |
YGNACIO VALLEY RD COR #1
477 crashes · 27 KSI · 7 fatal · 📈 Worsening: era B 17 KSI |
27 |
7 |
HAWK beacon, Raised median, LPI+APS all signals, LED lighting, HV crosswalks, Ped countdown signals |
TREAT BL COR #2
111 crashes · 9 KSI · 2 fatal · 📈 Worsening: era B 6 KSI |
9 |
2 |
HAWK beacon, Protected LT, LPI+APS, LED lighting, Ped refuge islands, RRFBs, Speed calming |
N MAIN ST COR #3
198 crashes · 6 KSI · 1 fatal · 📈 Worsening: era B 4 KSI |
6 |
1 |
HAWK beacon, Class IV bike lanes, RRFB crossings, Ped refuge islands, LED lighting, LPI at signals |
NORTH CALIFORNIA BL COR #4
52 crashes · 4 KSI · 1 fatal · 📈 Worsening: era B 3 KSI |
4 |
1 |
HAWK beacon, LPI, Bulb-outs, HV crosswalk, APS, Signal upgrade, Speed feedback signs |
YGNACIO VALLEY RD & OAK GROVE RD INT #1
23 crashes · 3 KSI · 1 fatal |
3 |
1 |
Protected LT, LPI, LED intersection lighting, HV crosswalk, APS |
YGNACIO VALLEY RD & WALNUT BL INT #2
12 crashes · 2 KSI · 0 fatal |
2 |
0 |
LPI, Bulb-outs, HV crosswalk, APS, Signal upgrade, Ped countdown |
Citywide programs
| Program | Type | Justification (2021–2025) |
| LPI + APS Rollout (~22 HIN intersections) |
SYS |
1232 signal/ROW crashes (70 post-COVID KSI); LPI CMF=0.13–0.30 ped fatality reduction |
| LED Intersection Lighting (462 dark crashes, 51 KSI) |
LIGHT |
Dark KSI rate 9.4%→12.7%; 28.4% of ped KSI in dark; CMF=0.72 for dark crashes |
| Speed Feedback Signs + Road Diet Eval |
SPEED |
Unsafe Speed = #1 PCF with 485 crashes; KSI rate 3.0%→3.8%; 25 radar signs on HIN corridors |
| DUI Enforcement + Safe Routes Outreach |
BEH |
159 alcohol crashes (30 KSI, 18.9% rate); 3.9× multiplier; Fri–Sun 9PM+ highest risk window |
What we bring & recommended ask
-
CCTSAP 2024 provides the action plan foundation — Walnut Creek-specific appendix available. CCTA's adopted countywide CCTSAP covers all CC cities. Walnut Creek should adopt the city-specific appendix by Council resolution and complete the USDOT Self-Certification Worksheet to confirm implementation grant eligibility by May 26, 2026.
-
+72.0% KSI rate shift — compelling post-COVID safety narrative. Walnut Creek’s severity shift (4.47%→7.69%) over equal 5-year windows demonstrates the precise data-backed deterioration SS4A reviewers prioritize. SWITRS analysis is complete across all 2,029 city-street collisions (2015–2025).
-
FHWA Safe System HIN analysis complete. FHWA-weighted Safe System scoring across all 77 HIN corridors and 162 intersections. YGNACIO VALLEY RD (27 KSI) and TREAT BL (9 KSI) are the top-tier anchors for the application narrative and project location workbook.
-
2,029 crashes analyzed with full multivariate breakdown. Pre/post-COVID KSI trends, 22 fatalities documented, ped/bike/alcohol/dark-condition patterns quantified. 243 ped (42 KSI), 462 dark (51 KSI), 159 alcohol (30 KSI) pools are pre-validated for grant narratives.
-
HIN-to-countermeasure mapping complete — project identification is done. Every HIN corridor matched to FHWA-eligible countermeasures with cost ranges. Remaining work: formal application narrative, project workbook, and self-certification documentation.
Analysis basis: SWITRS/TIMS 2015–2025 (excl. 2020) · FHWA Safe System HIN methodology · SS4A NOFO FY2026 · CCTSAP 2024 (CCTA) · Deadline: May 26, 2026
SS4A FY2026 — Recommended Implementation Grant
Multi-Corridor HIN Implementation Package
$5.4M – $16.3M federal · 80% federal / 20% local
4 HIN intersections + 3 corridor programs + 4 citywide programs. Balanced portfolio: infrastructure (LPI, LED lighting, raised median, RRFB), speed management, and behavioral programs. YGNACIO VALLEY RD + TREAT BL anchor projects with 36 combined KSI provide the core safety case.
CCTSAP 2024 Countywide
City adoption recommended
⚡ Due May 26, 2026
SWITRS 2015–2025
+72% KSI rate
Why this application portfolio can win
C12 track record: 3 projects, $2.46M funded — proven delivery
Walnut Creek won 3 HSIP projects in C12 ($2.46M) — H12-04-062, H12-04-063.... Returning applicants with delivery history score higher. Each prior award provides a direct C13 scale-up template.
Collision profile maps precisely to highest-scoring C13 categories
Dark crashes: 462 (51 KSI) → BCR Lighting (avg C12 grant $1.84M)
Speed #1 PCF: 485 crashes — KSI rate 3.0%→3.8% → BCR Speed calming
Ped: 243 (42 KSI, 17.3% rate) → VRU Special Rule bonus
Bike: 183 (14 KSI) → SA-Bike set-aside
Signal/Broadside: 1232 crashes → BCR Signal+LPI
HSIP award history & statewide comparables
Walnut Creek C12
$2.46M
3 prior projects — direct C13 scale-up templates.
Long Beach C12
$9.7M
Retroreflective sign upgrade — comparable BCR scope for speed management application.
Glendale C12
$8.25M
Signal+LPI+APS citywide — model for BCR+VRU hybrid application.
Recommended C13 portfolio (2021–2025 crash data)
| Application |
Countermeasures |
Category |
Est. range |
Signal Modernization + VRU #1
608 broadside + 243 ped (42 KSI) |
LPI+APS at 22 HIN intersections, Retroreflective backplates, Protected LT, Countdown signals. Builds on H12-04-062. |
BCR VRU+ |
$3–7M |
Intersection LED Lighting #2
462 dark crashes (51 KSI); dark rate 9.4%→12.7% |
LED at 28 HIN intersections; corridor lighting on top 3 HIN corridors; retroreflective backplates |
BCR |
$1.5–4.5M |
Raised Median — YGNACIO VALLEY RD #3
YGNACIO VALLEY RD: 27 KSI + TREAT BL: 9 KSI |
Raised median channelization; restrict LT conflicts; ped refuge islands; Protected-permissive LT phasing |
BCR |
$4–9M |
SA-PedCrossing × 2
243 ped (42 KSI); 28.4% dark KSI rate |
RRFBs at unsignalized crossings on YGNACIO VALLEY + TREAT BL; curb extensions; ped refuge. |
SA-Ped |
2 × $400K |
SA-Bike Safety × 2
183 bike crashes (14 KSI); top HIN corridors |
Class IV separated bike lanes on YGNACIO VALLEY ; bike detection at signals; green conflict zone markings. Builds on H12-04-064. |
SA-Bike |
2 × $360K |
Speed + Retroreflective Signs
485 speed crashes (#1 PCF); KSI rate 3.0%→3.8% |
Dynamic speed feedback signs (25+); raised crosswalks; retroreflective sign upgrade citywide; automated enforcement study |
BCR |
$2–6M |
C13 Winning Portfolio Formula
App 1 — BCR+VRU: Signal+LPI+APS+Backplates$3–7M
App 2 — BCR: Intersection LED Lighting$1.5–4.5M
App 3 — BCR: Raised Median (YGNACIO VALLEY RD)$4–9M
Apps 4–5 — SA-PedCrossing × 2 (different corridors)2 × $400K
Apps 6–7 — SA-Bike Safety × 2 (different corridors)2 × $360K
App 8 — BCR: Speed Mgmt + Retroreflective Signs$1.5–4M
Total C13 target: $5M – $18M · 0% local match · VRU Special Rule qualifies (426 VRU crashes, 56 KSI)
Walnut Creek HSIP application history
| Project ID | Category | Award | Description |
H12-04-062 |
BCR |
$1.58M |
Signal modernization+LPI+APS: Ygnacio Valley Rd |
H12-04-063 |
BCR |
$537K |
LT phase conversion + mast arm upgrades |
H12-04-064 |
SA-Bike |
$346K |
Class IV bike lane: N Main St |
What we bring to this application
3 prior HSIP projects prove Walnut Creek delivery. H12-04-062 (BCR, $1.58M), H12-04-063 (BCR, $537K), H12-04-064 (SA-Bike, $346K). Each provides a direct template for C13 scale-up. Returning applicants with completion history are scored higher.
+72.0% KSI rate change — powerful post-COVID safety narrative. Walnut Creek's severity shift (4.47%→7.69%) demonstrates the precise safety deterioration HSIP C13 prioritizes. SWITRS 2021–2025 data is fully analyzed: 462 dark (51 KSI), 485 speed (16 KSI), 243 ped (42 KSI), 183 bike (14 KSI).
Post-COVID (2021–2025) crash pools pre-validated for BCR calculation. All HSIP project recommendations based on 5-year post-COVID data only. Crash pools are quantified by countermeasure category — each application has a pre-validated data foundation for BCR submission.
SA-Ped and SA-Bike set-asides are low-risk, high-return. Both SA-Ped and SA-Bike have 80%+ win rates in C12. 73 SA-Ped and 30 SA-Bike projects funded C12 statewide. Submit 2 applications per category on different corridors (YGNACIO VALLEY RD + TREAT BL).
C13 portfolio extends every prior HSIP investment in Walnut Creek. Signal/LPI from H12-04-062 scales to citywide LPI+APS at 22 HIN intersections. Each C13 application directly extends proven C12 work.
SWITRS/TIMS 2021–2025
3 prior HSIP wins (C12)
120 KSI · 22 fatals
BCR · SA-Ped · SA-Bike · VRU