$
trafficgrants.ai
Confidential Grant Strategy Brief
City of Walnut Creek — Federal Safety Grant
Strategy & Application Roadmap
Contra Costa County · SWITRS/TIMS 2015–2025 (excl. 2020) · City streets only · FHWA Safe System methodology · May 26, 2026 SS4A deadline
120 KSI collisions
2015–2025
22 Fatalities
city streets
+72% KSI rate
post-COVID
$2.46M Prior HSIP
awarded
$5–18M+ Combined
target portfolio
🏗️
USDOT · Implementation Grant · CCTSAP 2024 countywide action plan · Contra Costa County
$5.4–16.3M
Federal ask range
11
HIN projects identified
⚡ Application Deadline: May 26, 2026 at 5:00 PM EDT
Safety case & program alignment
+72.0% KSI rate post-COVID — Walnut Creek's severity crisis requires urgent intervention
Walnut Creek’s KSI rate shifted from 4.47% (2015–19) to 7.69% (2021–25) — a +72.0% increase. Volume fell but each crash is significantly more likely to kill or severely injure — a severity crisis, not a volume crisis. 70 post-COVID KSI across 77 HIN corridors demand immediate targeted investment.
CCTSAP 2024 countywide action plan — Walnut Creek-specific appendix available for adoption
CCTA adopted the Countywide Comprehensive Transportation Safety Action Plan (CCTSAP 2024) — a USDOT-eligible action plan covering all Contra Costa cities including Walnut Creek. The CCTSAP includes a city-specific appendix for Walnut Creek. Upon local adoption resolution and completion of the USDOT Self-Certification Worksheet, Walnut Creek can apply for a FY2026 SS4A Implementation Grant targeting $5–12M federal.
22
Fatalities
city streets
77
HIN corridors
identified
CCTSAP 2024
Countywide
action plan
Project breakdown by category (2021–2025 crash data)
CategoryProjectsCost Est.Focus locations
HIN Intersections 4 $2.2M YGNACIO VALLEY RD & OAK G, YGNACIO VALLEY RD & WALNU — ranked by 2021–25 KSI
Corridor Programs 3 $6.7M YGNACIO VALLEY RD, TREAT BL, N MAIN ST — LPI + lighting + raised median
Citywide Programs 4 $1.9M LPI+APS rollout, LED intersection lighting, speed feedback DUI enforcement
⚡ Two-step path: Adopt CCTSAP appendix + complete Self-Certification Worksheet
Step 1: City Council adopts Walnut Creek-specific CCTSAP appendix (available from CCTA). Step 2: Complete USDOT Self-Certification Worksheet confirming CCTSAP satisfies all required action plan components. If confirmed → submit FY2026 Implementation Grant by May 26, 2026. Contact CCTA for the Walnut Creek appendix and eligibility guidance. Recommend pre-application USDOT review (due April 24, 2026).
Priority SS4A projects — 2021–2025 crash data
Tier 1 — Fatal & high-KSI corridors (2021–2025)
LocationKSIFatalCountermeasures
YGNACIO VALLEY RD COR #1
477 crashes · 27 KSI · 7 fatal · 📈 Worsening: era B 17 KSI
27 7 HAWK beacon, Raised median, LPI+APS all signals, LED lighting, HV crosswalks, Ped countdown signals
TREAT BL COR #2
111 crashes · 9 KSI · 2 fatal · 📈 Worsening: era B 6 KSI
9 2 HAWK beacon, Protected LT, LPI+APS, LED lighting, Ped refuge islands, RRFBs, Speed calming
N MAIN ST COR #3
198 crashes · 6 KSI · 1 fatal · 📈 Worsening: era B 4 KSI
6 1 HAWK beacon, Class IV bike lanes, RRFB crossings, Ped refuge islands, LED lighting, LPI at signals
NORTH CALIFORNIA BL COR #4
52 crashes · 4 KSI · 1 fatal · 📈 Worsening: era B 3 KSI
4 1 HAWK beacon, LPI, Bulb-outs, HV crosswalk, APS, Signal upgrade, Speed feedback signs
YGNACIO VALLEY RD & OAK GROVE RD INT #1
23 crashes · 3 KSI · 1 fatal
3 1 Protected LT, LPI, LED intersection lighting, HV crosswalk, APS
YGNACIO VALLEY RD & WALNUT BL INT #2
12 crashes · 2 KSI · 0 fatal
2 0 LPI, Bulb-outs, HV crosswalk, APS, Signal upgrade, Ped countdown
Citywide programs
ProgramTypeJustification (2021–2025)
LPI + APS Rollout (~22 HIN intersections) SYS 1232 signal/ROW crashes (70 post-COVID KSI); LPI CMF=0.13–0.30 ped fatality reduction
LED Intersection Lighting (462 dark crashes, 51 KSI) LIGHT Dark KSI rate 9.4%→12.7%; 28.4% of ped KSI in dark; CMF=0.72 for dark crashes
Speed Feedback Signs + Road Diet Eval SPEED Unsafe Speed = #1 PCF with 485 crashes; KSI rate 3.0%→3.8%; 25 radar signs on HIN corridors
DUI Enforcement + Safe Routes Outreach BEH 159 alcohol crashes (30 KSI, 18.9% rate); 3.9× multiplier; Fri–Sun 9PM+ highest risk window
What we bring & recommended ask
Analysis basis:  SWITRS/TIMS 2015–2025 (excl. 2020) · FHWA Safe System HIN methodology · SS4A NOFO FY2026 · CCTSAP 2024 (CCTA) · Deadline: May 26, 2026
SS4A FY2026 — Recommended Implementation Grant
Multi-Corridor HIN Implementation Package
$5.4M – $16.3M federal · 80% federal / 20% local
4 HIN intersections + 3 corridor programs + 4 citywide programs. Balanced portfolio: infrastructure (LPI, LED lighting, raised median, RRFB), speed management, and behavioral programs. YGNACIO VALLEY RD + TREAT BL anchor projects with 36 combined KSI provide the core safety case.
CCTSAP 2024 Countywide City adoption recommended ⚡ Due May 26, 2026 SWITRS 2015–2025 +72% KSI rate
🏛️
Prior C12 projects funded ($2.46M) · BCR + SA-Ped + SA-Bike + VRU pathway
$5–18M
Portfolio potential
$2.46M
Prior HSIP won
6
Applications planned
C13 Applications open ~Fall 2026 · Prepare now
Why this application portfolio can win
C12 track record: 3 projects, $2.46M funded — proven delivery
Walnut Creek won 3 HSIP projects in C12 ($2.46M) — H12-04-062, H12-04-063.... Returning applicants with delivery history score higher. Each prior award provides a direct C13 scale-up template.
Collision profile maps precisely to highest-scoring C13 categories
Dark crashes: 462 (51 KSI) → BCR Lighting (avg C12 grant $1.84M)
Speed #1 PCF: 485 crashes — KSI rate 3.0%→3.8% → BCR Speed calming
Ped: 243 (42 KSI, 17.3% rate) → VRU Special Rule bonus
Bike: 183 (14 KSI) → SA-Bike set-aside
Signal/Broadside: 1232 crashes → BCR Signal+LPI
HSIP award history & statewide comparables
Walnut Creek C12
$2.46M
3 prior projects — direct C13 scale-up templates.
Long Beach C12
$9.7M
Retroreflective sign upgrade — comparable BCR scope for speed management application.
Glendale C12
$8.25M
Signal+LPI+APS citywide — model for BCR+VRU hybrid application.
Recommended C13 portfolio (2021–2025 crash data)
Application Countermeasures Category Est. range
Signal Modernization + VRU #1
608 broadside + 243 ped (42 KSI)
LPI+APS at 22 HIN intersections, Retroreflective backplates, Protected LT, Countdown signals. Builds on H12-04-062. BCR VRU+ $3–7M
Intersection LED Lighting #2
462 dark crashes (51 KSI); dark rate 9.4%→12.7%
LED at 28 HIN intersections; corridor lighting on top 3 HIN corridors; retroreflective backplates BCR $1.5–4.5M
Raised Median — YGNACIO VALLEY RD #3
YGNACIO VALLEY RD: 27 KSI + TREAT BL: 9 KSI
Raised median channelization; restrict LT conflicts; ped refuge islands; Protected-permissive LT phasing BCR $4–9M
SA-PedCrossing × 2
243 ped (42 KSI); 28.4% dark KSI rate
RRFBs at unsignalized crossings on YGNACIO VALLEY + TREAT BL; curb extensions; ped refuge. SA-Ped 2 × $400K
SA-Bike Safety × 2
183 bike crashes (14 KSI); top HIN corridors
Class IV separated bike lanes on YGNACIO VALLEY ; bike detection at signals; green conflict zone markings. Builds on H12-04-064. SA-Bike 2 × $360K
Speed + Retroreflective Signs
485 speed crashes (#1 PCF); KSI rate 3.0%→3.8%
Dynamic speed feedback signs (25+); raised crosswalks; retroreflective sign upgrade citywide; automated enforcement study BCR $2–6M
C13 Winning Portfolio Formula
App 1 — BCR+VRU: Signal+LPI+APS+Backplates$3–7M
App 2 — BCR: Intersection LED Lighting$1.5–4.5M
App 3 — BCR: Raised Median (YGNACIO VALLEY RD)$4–9M
Apps 4–5 — SA-PedCrossing × 2 (different corridors)2 × $400K
Apps 6–7 — SA-Bike Safety × 2 (different corridors)2 × $360K
App 8 — BCR: Speed Mgmt + Retroreflective Signs$1.5–4M
Total C13 target: $5M – $18M · 0% local match · VRU Special Rule qualifies (426 VRU crashes, 56 KSI)
Walnut Creek HSIP application history
Project IDCategoryAwardDescription
H12-04-062
BCR $1.58M Signal modernization+LPI+APS: Ygnacio Valley Rd
H12-04-063
BCR $537K LT phase conversion + mast arm upgrades
H12-04-064
SA-Bike $346K Class IV bike lane: N Main St
What we bring to this application
SWITRS/TIMS 2021–2025 3 prior HSIP wins (C12) 120 KSI · 22 fatals BCR · SA-Ped · SA-Bike · VRU