Confidential Grant Strategy Brief
City of Richmond — Federal Safety Grant
Strategy & Application Roadmap
Contra Costa County · SWITRS/TIMS 2015–2025 (excl. 2020) · City streets only · FHWA Safe System methodology · May 26, 2026 SS4A deadline
205 KSI collisions
2015–2025
37 Fatalities
city streets
+37% KSI rate
post-COVID
$1.24M Prior HSIP
awarded
$5–18M+ Combined
target portfolio
🏗️
USDOT · Implementation Grant · CCTSAP 2024 countywide action plan · Contra Costa County
$4.5–13.6M
Federal ask range
9
HIN projects identified
⚡ Application Deadline: May 26, 2026 at 5:00 PM EDT
Safety case & program alignment
+36.6% KSI rate post-COVID — Richmond's severity crisis requires urgent intervention
Richmond’s KSI rate shifted from 8.22% (2015–19) to 11.23% (2021–25) — a +36.6% increase. Volume fell but each crash is significantly more likely to kill or severely injure — a severity crisis, not a volume crisis. 73 post-COVID KSI across 107 HIN corridors demand immediate targeted investment.
Active SS4A partner — CCTA FY2024 grant + CCTSAP 2024 action plan foundation
Richmond is a named partner city in CCTA's FY2024 SS4A Planning & Demonstration Grant ($1.6M awarded November 2024). The CCTA Countywide Comprehensive Transportation Safety Action Plan (CCTSAP 2024) provides the action plan foundation for all CC cities. Upon completion of the CCTA FY2024 grant deliverables and the USDOT Self-Certification Worksheet, Richmond is positioned to apply for a FY2026 SS4A Implementation Grant targeting $5–12M federal.
37
Fatalities
city streets
107
HIN corridors
identified
CCTSAP 2024
Action plan
foundation
Project breakdown by category (2021–2025 crash data)
CategoryProjectsCost Est.Focus locations
HIN Intersections 4 $2.2M MACDONALD AV & 21ST ST, BARRETT AV & 37TH ST — ranked by 2021–25 KSI
Corridor Programs 3 $5.6M CUTTING BL, BARRETT AV, SAN PABLO AV — LPI + lighting + raised median
Citywide Programs 2 $1.3M LPI+APS rollout, LED intersection lighting,
⚡ Action Required: Complete USDOT Self-Certification Worksheet before May 26 deadline
The CCTSAP 2024 (adopted by CCTA) provides the countywide action plan foundation. Richmond must complete the USDOT Self-Certification Worksheet confirming the CCTSAP satisfies all required SS4A action plan components. If all components are confirmed → submit Implementation Grant directly. If gaps exist, include supplemental planning activity. Recommend submitting completed worksheet to USDOT for pre-application review (due April 24, 2026).
Priority SS4A projects — 2021–2025 crash data
Tier 1 — Fatal & high-KSI corridors (2021–2025)
LocationKSIFatalCountermeasures
CUTTING BL COR #1
136 crashes · 17 KSI · 4 fatal · 🔁 Persistent: era B 1 KSI
17 4 HAWK beacon, Raised median, LPI+APS all signals, LED lighting, HV crosswalks, Ped countdown signals
BARRETT AV COR #2
201 crashes · 15 KSI · 2 fatal · 🔁 Persistent: era B 3 KSI
15 2 HAWK beacon, Protected LT, LPI+APS, LED lighting, Ped refuge islands, RRFBs, Speed calming
SAN PABLO AV COR #3
119 crashes · 14 KSI · 4 fatal · 📈 Worsening: era B 8 KSI
14 4 HAWK beacon, Class IV bike lanes, RRFB crossings, Ped refuge islands, LED lighting, LPI at signals
MACDONALD AV COR #4
150 crashes · 13 KSI · 1 fatal · 🔁 Persistent: era B 4 KSI
13 1 HAWK beacon, LPI, Bulb-outs, HV crosswalk, APS, Signal upgrade, Speed feedback signs
MACDONALD AV & 21ST ST INT #1
5 crashes · 3 KSI · 0 fatal
3 0 LPI, Bulb-outs, HV crosswalk, APS, Signal upgrade, Ped countdown
BARRETT AV & 37TH ST INT #2
15 crashes · 2 KSI · 0 fatal
2 0 LPI, Bulb-outs, HV crosswalk, APS, Signal upgrade, Ped countdown
Citywide programs
ProgramTypeJustification (2021–2025)
LPI + APS Rollout (~22 HIN intersections) SYS 1287 signal/ROW crashes (73 post-COVID KSI); LPI CMF=0.13–0.30 ped fatality reduction
LED Intersection Lighting (654 dark crashes, 98 KSI) LIGHT Dark KSI rate 13.4%→18.7%; 39.7% of ped KSI in dark; CMF=0.72 for dark crashes
What we bring & recommended ask
Analysis basis:  SWITRS/TIMS 2015–2025 (excl. 2020) · FHWA Safe System HIN methodology · SS4A NOFO FY2026 · CCTSAP 2024 (CCTA) · Deadline: May 26, 2026
SS4A FY2026 — Recommended Implementation Grant
Multi-Corridor HIN Implementation Package
$4.5M – $13.6M federal · 80% federal / 20% local
4 HIN intersections + 3 corridor programs + 2 citywide programs. Balanced portfolio: infrastructure (LPI, LED lighting, raised median, RRFB), speed management, and behavioral programs. CUTTING BL + BARRETT AV anchor projects with 32 combined KSI provide the core safety case.
CCTA SS4A Partner (FY2024) CCTSAP 2024 Adopted ⚡ Due May 26, 2026 SWITRS 2015–2025 +37% KSI rate
🏛️
Prior C12 projects funded ($1.24M) · BCR + SA-Ped + SA-Bike + VRU pathway
$5–18M
Portfolio potential
$1.24M
Prior HSIP won
5
Applications planned
C13 Applications open ~Fall 2026 · Prepare now
Why this application portfolio can win
C12 track record: 2 projects, $1.24M funded — proven delivery
Richmond won 2 HSIP projects in C12 ($1.24M) — H12-04-046, H12-04-047. Returning applicants with delivery history score higher. Each prior award provides a direct C13 scale-up template.
Collision profile maps precisely to highest-scoring C13 categories
Dark crashes: 654 (98 KSI) → BCR Lighting (avg C12 grant $1.84M)
Ped: 282 (56 KSI, 19.9% rate) → VRU Special Rule bonus
Bike: 167 (19 KSI) → SA-Bike set-aside
Signal/Broadside: 1287 crashes → BCR Signal+LPI
HSIP award history & statewide comparables
Richmond C12
$1.24M
2 prior projects — direct C13 scale-up templates.
Long Beach C12
$9.7M
Retroreflective sign upgrade — comparable BCR scope for speed management application.
Glendale C12
$8.25M
Signal+LPI+APS citywide — model for BCR+VRU hybrid application.
Recommended C13 portfolio (2021–2025 crash data)
Application Countermeasures Category Est. range
Signal Modernization + VRU #1
940 broadside + 282 ped (56 KSI)
LPI+APS at 22 HIN intersections, Retroreflective backplates, Protected LT, Countdown signals. Builds on H12-04-046. BCR VRU+ $3–7M
Intersection LED Lighting #2
654 dark crashes (98 KSI); dark rate 13.4%→18.7%
LED at 28 HIN intersections; corridor lighting on top 3 HIN corridors; retroreflective backplates BCR $2.0–5.0M
Raised Median — CUTTING BL #3
CUTTING BL: 17 KSI + BARRETT AV: 15 KSI
Raised median channelization; restrict LT conflicts; ped refuge islands; Protected-permissive LT phasing BCR $2–6M
SA-PedCrossing × 2
282 ped (56 KSI); 39.7% dark KSI rate
RRFBs at unsignalized crossings on CUTTING BL + BARRETT AV; curb extensions; ped refuge. Builds on H12-04-047. SA-Ped 2 × $400K
SA-Bike Safety × 2
167 bike crashes (19 KSI); top HIN corridors
Class IV separated bike lanes on CUTTING BL; bike detection at signals; green conflict zone markings. SA-Bike 2 × $360K
Motorcycle Safety + LED Lighting
117 motorcycle crashes (33 KSI, 28.2% KSI rate)
LED at motorcycle crash nodes; speed feedback signs on HIN corridors; advanced stop bars; skid-resistant pavement BCR $800K–3M
C13 Winning Portfolio Formula
App 1 — BCR+VRU: Signal+LPI+APS+Backplates$3–7M
App 2 — BCR: Intersection LED Lighting$2.0–5.0M
App 3 — BCR: Raised Median (CUTTING BL)$2–6M
Apps 4–5 — SA-PedCrossing × 2 (different corridors)2 × $400K
Apps 6–7 — SA-Bike Safety × 2 (different corridors)2 × $360K
Total C13 target: $5M – $18M · 0% local match · VRU Special Rule qualifies (449 VRU crashes, 75 KSI)
Richmond HSIP application history
Project IDCategoryAwardDescription
H12-04-046
BCR $892K Signals+LPI+APS: Cutting Blvd & San Pablo Ave
H12-04-047
SA-Ped $348K RRFBs + curb extensions: Cutting Blvd midblock
What we bring to this application
SWITRS/TIMS 2021–2025 2 prior HSIP wins (C12) 205 KSI · 37 fatals BCR · SA-Ped · SA-Bike · VRU