Confidential Grant Strategy Brief
City of Pittsburg — Federal Safety Grant
Strategy & Application Roadmap
Contra Costa County · SWITRS/TIMS 2015–2025 (excl. 2020) · City streets only · FHWA Safe System methodology · May 26, 2026 SS4A deadline
188 KSI collisions
2015–2025
47 Fatalities
city streets
+52% KSI rate
post-COVID
$1.24M Prior HSIP
awarded
$5–18M+ Combined
target portfolio
🏗️
USDOT · Implementation Grant · CCTSAP 2024 countywide action plan · Contra Costa County
$4.9–14.6M
Federal ask range
10
HIN projects identified
⚡ Application Deadline: May 26, 2026 at 5:00 PM EDT
Safety case & program alignment
+52.1% KSI rate post-COVID — Pittsburg's severity crisis requires urgent intervention
Pittsburg’s KSI rate shifted from 11.61% (2015–19) to 17.66% (2021–25) — a +52.1% increase. Volume fell but each crash is significantly more likely to kill or severely injure — a severity crisis, not a volume crisis. 98 post-COVID KSI across 65 HIN corridors demand immediate targeted investment.
CCTSAP 2024 countywide action plan — Pittsburg-specific appendix available for adoption
CCTA adopted the Countywide Comprehensive Transportation Safety Action Plan (CCTSAP 2024) — a USDOT-eligible action plan covering all Contra Costa cities including Pittsburg. The CCTSAP includes a city-specific appendix for Pittsburg. Upon local adoption resolution and completion of the USDOT Self-Certification Worksheet, Pittsburg can apply for a FY2026 SS4A Implementation Grant targeting $5–12M federal.
47
Fatalities
city streets
65
HIN corridors
identified
CCTSAP 2024
Countywide
action plan
Project breakdown by category (2021–2025 crash data)
CategoryProjectsCost Est.Focus locations
HIN Intersections 4 $2.2M EAST LELAND RD & LOVERIDG, RAILROAD AV & CALIFORNIA — ranked by 2021–25 KSI
Corridor Programs 3 $5.9M RAILROAD AV, EAST LELAND RD, WEST LELAND RD — LPI + lighting + raised median
Citywide Programs 3 $1.6M LPI+APS rollout, LED intersection lighting, speed feedback
⚡ Two-step path: Adopt CCTSAP appendix + complete Self-Certification Worksheet
Step 1: City Council adopts Pittsburg-specific CCTSAP appendix (available from CCTA). Step 2: Complete USDOT Self-Certification Worksheet confirming CCTSAP satisfies all required action plan components. If confirmed → submit FY2026 Implementation Grant by May 26, 2026. Contact CCTA for the Pittsburg appendix and eligibility guidance. Recommend pre-application USDOT review (due April 24, 2026).
Priority SS4A projects — 2021–2025 crash data
Tier 1 — Fatal & high-KSI corridors (2021–2025)
LocationKSIFatalCountermeasures
RAILROAD AV COR #1
98 crashes · 20 KSI · 4 fatal · 🔁 Persistent: era B 0 KSI
20 4 HAWK beacon, Raised median, LPI+APS all signals, LED lighting, HV crosswalks, Ped countdown signals
EAST LELAND RD COR #2
81 crashes · 16 KSI · 3 fatal · 🔁 Persistent: era B 5 KSI
16 3 HAWK beacon, Protected LT, LPI+APS, LED lighting, Ped refuge islands, RRFBs, Speed calming
WEST LELAND RD COR #3
97 crashes · 15 KSI · 6 fatal · 🔁 Persistent: era B 4 KSI
15 6 HAWK beacon, Class IV bike lanes, RRFB crossings, Ped refuge islands, LED lighting, LPI at signals
RAILROAD AVE COR #4
72 crashes · 12 KSI · 3 fatal · ⚠️ Emerging: era B 12 KSI
12 3 HAWK beacon, LPI, Bulb-outs, HV crosswalk, APS, Signal upgrade, Speed feedback signs
EAST LELAND RD & LOVERIDGE RD INT #1
8 crashes · 2 KSI · 0 fatal
2 0 LPI, Bulb-outs, HV crosswalk, APS, Signal upgrade, Ped countdown
RAILROAD AV & CALIFORNIA AV INT #2
7 crashes · 1 KSI · 0 fatal
1 0 LPI, Bulb-outs, HV crosswalk, APS, Signal upgrade, Ped countdown
Citywide programs
ProgramTypeJustification (2021–2025)
LPI + APS Rollout (~22 HIN intersections) SYS 690 signal/ROW crashes (98 post-COVID KSI); LPI CMF=0.13–0.30 ped fatality reduction
LED Intersection Lighting (448 dark crashes, 102 KSI) LIGHT Dark KSI rate 22.7%→22.8%; 44.0% of ped KSI in dark; CMF=0.72 for dark crashes
Speed Feedback Signs + Road Diet Eval SPEED Unsafe Speed = #1 PCF with 328 crashes; KSI rate 13.0%→22.7%; 25 radar signs on HIN corridors
What we bring & recommended ask
Analysis basis:  SWITRS/TIMS 2015–2025 (excl. 2020) · FHWA Safe System HIN methodology · SS4A NOFO FY2026 · CCTSAP 2024 (CCTA) · Deadline: May 26, 2026
SS4A FY2026 — Recommended Implementation Grant
Multi-Corridor HIN Implementation Package
$4.9M – $14.6M federal · 80% federal / 20% local
4 HIN intersections + 3 corridor programs + 3 citywide programs. Balanced portfolio: infrastructure (LPI, LED lighting, raised median, RRFB), speed management, and behavioral programs. RAILROAD AV + EAST LELAND RD anchor projects with 36 combined KSI provide the core safety case.
CCTSAP 2024 Countywide City adoption recommended ⚡ Due May 26, 2026 SWITRS 2015–2025 +52% KSI rate
🏛️
Prior C12 projects funded ($1.24M) · BCR + SA-Ped + SA-Bike + VRU pathway
$5–18M
Portfolio potential
$1.24M
Prior HSIP won
6
Applications planned
C13 Applications open ~Fall 2026 · Prepare now
Why this application portfolio can win
C12 track record: 2 projects, $1.24M funded — proven delivery
Pittsburg won 2 HSIP projects in C12 ($1.24M) — H12-04-071, H12-04-072. Returning applicants with delivery history score higher. Each prior award provides a direct C13 scale-up template.
Collision profile maps precisely to highest-scoring C13 categories
Dark crashes: 448 (102 KSI) → BCR Lighting (avg C12 grant $1.84M)
Speed #1 PCF: 328 crashes — KSI rate 13.0%→22.7% → BCR Speed calming
Ped: 166 (59 KSI, 35.5% rate) → VRU Special Rule bonus
Bike: 69 (9 KSI) → SA-Bike set-aside
Signal/Broadside: 690 crashes → BCR Signal+LPI
HSIP award history & statewide comparables
Pittsburg C12
$1.24M
2 prior projects — direct C13 scale-up templates.
Long Beach C12
$9.7M
Retroreflective sign upgrade — comparable BCR scope for speed management application.
Glendale C12
$8.25M
Signal+LPI+APS citywide — model for BCR+VRU hybrid application.
Recommended C13 portfolio (2021–2025 crash data)
Application Countermeasures Category Est. range
Signal Modernization + VRU #1
401 broadside + 166 ped (59 KSI)
LPI+APS at 22 HIN intersections, Retroreflective backplates, Protected LT, Countdown signals. Builds on H12-04-071. BCR VRU+ $3–7M
Intersection LED Lighting #2
448 dark crashes (102 KSI); dark rate 22.7%→22.8%
LED at 28 HIN intersections; corridor lighting on top 3 HIN corridors; retroreflective backplates BCR $2.0–5.0M
Raised Median — RAILROAD AV #3
RAILROAD AV: 20 KSI + EAST LELAND RD: 16 KSI
Raised median channelization; restrict LT conflicts; ped refuge islands; Protected-permissive LT phasing BCR $3–7M
SA-PedCrossing × 2
166 ped (59 KSI); 44.0% dark KSI rate
RRFBs at unsignalized crossings on RAILROAD AV + EAST LELAND RD; curb extensions; ped refuge. Builds on H12-04-072. SA-Ped 2 × $400K
SA-Bike Safety × 2
69 bike crashes (9 KSI); top HIN corridors
Class IV separated bike lanes on RAILROAD AV; bike detection at signals; green conflict zone markings. SA-Bike 2 × $360K
Speed + Retroreflective Signs
328 speed crashes (#1 PCF); KSI rate 13.0%→22.7%
Dynamic speed feedback signs (25+); raised crosswalks; retroreflective sign upgrade citywide; automated enforcement study BCR $2–6M
C13 Winning Portfolio Formula
App 1 — BCR+VRU: Signal+LPI+APS+Backplates$3–7M
App 2 — BCR: Intersection LED Lighting$2.0–5.0M
App 3 — BCR: Raised Median (RAILROAD AV)$3–7M
Apps 4–5 — SA-PedCrossing × 2 (different corridors)2 × $400K
Apps 6–7 — SA-Bike Safety × 2 (different corridors)2 × $360K
App 8 — BCR: Speed Mgmt + Retroreflective Signs$1.5–4M
Total C13 target: $5M – $18M · 0% local match · VRU Special Rule qualifies (235 VRU crashes, 68 KSI)
Pittsburg HSIP application history
Project IDCategoryAwardDescription
H12-04-071
BCR $892K Signals+LPI+APS: Railroad Ave corridor
H12-04-072
SA-Ped $348K RRFBs: Cumberland St + E Leland Rd
What we bring to this application
SWITRS/TIMS 2021–2025 2 prior HSIP wins (C12) 188 KSI · 47 fatals BCR · SA-Ped · SA-Bike · VRU