City of Oakley — Federal Safety Grant
Strategy & Application Roadmap
Contra Costa County · SWITRS/TIMS 2015–2025 (excl. 2020) · City streets only · FHWA Safe System methodology · May 26, 2026 SS4A deadline
57 KSI collisions
2015–2025
18 Fatalities
city streets
+1% KSI rate
post-COVID
$0.54M Prior HSIP
awarded
$5–18M+ Combined
target portfolio
🏗️
USDOT · Implementation Grant · CCTSAP 2024 countywide action plan · Contra Costa County
$4.6–13.8M
Federal ask range
10
HIN projects identified
⚡ Application Deadline: May 26, 2026 at 5:00 PM EDT
Safety case & program alignment
+0.9% KSI rate post-COVID — Oakley's severity crisis requires urgent intervention
Oakley’s KSI rate shifted from 12.25% (2015–19) to 12.36% (2021–25) — a +0.9% increase. Both volume and severity are rising — compounding the safety challenge. 32 post-COVID KSI across 23 HIN corridors demand immediate targeted investment.
CCTSAP 2024 countywide action plan — Oakley-specific appendix available for adoption
CCTA adopted the Countywide Comprehensive Transportation Safety Action Plan (CCTSAP 2024) — a USDOT-eligible action plan covering all Contra Costa cities including Oakley. The CCTSAP includes a city-specific appendix for Oakley. Upon local adoption resolution and completion of the USDOT Self-Certification Worksheet, Oakley can apply for a FY2026 SS4A Implementation Grant targeting $5–12M federal.
18
Fatalities
city streets
23
HIN corridors
identified
CCTSAP 2024
Countywide
action plan
Project breakdown by category (2021–2025 crash data)
CategoryProjectsCost Est.Focus locations
HIN Intersections 4 $2.2M MAIN ST & BIG BREAK RD, LAUREL RD & OHARA AV — ranked by 2021–25 KSI
Corridor Programs 3 $5.4M MAIN ST, LAUREL RD, EAST CYPRESS RD — LPI + lighting + raised median
Citywide Programs 3 $1.6M LPI+APS rollout, LED intersection lighting, speed feedback
⚡ Two-step path: Adopt CCTSAP appendix + complete Self-Certification Worksheet
Step 1: City Council adopts Oakley-specific CCTSAP appendix (available from CCTA). Step 2: Complete USDOT Self-Certification Worksheet confirming CCTSAP satisfies all required action plan components. If confirmed → submit FY2026 Implementation Grant by May 26, 2026. Contact CCTA for the Oakley appendix and eligibility guidance. Recommend pre-application USDOT review (due April 24, 2026).
Priority SS4A projects — 2021–2025 crash data
Tier 1 — Fatal & high-KSI corridors (2021–2025)
LocationKSIFatalCountermeasures
MAIN ST COR #1
118 crashes · 15 KSI · 2 fatal · 📈 Worsening: era B 11 KSI
15 2 HAWK beacon, Raised median, LPI+APS all signals, LED lighting, HV crosswalks, Ped countdown signals
LAUREL RD COR #2
73 crashes · 11 KSI · 5 fatal · 📈 Worsening: era B 7 KSI
11 5 Protected LT, LPI+APS, LED lighting, Ped refuge islands, RRFBs, Speed calming
EAST CYPRESS RD COR #3
27 crashes · 5 KSI · 3 fatal · 📈 Worsening: era B 3 KSI
5 3 Class IV bike lanes, RRFB crossings, Ped refuge islands, LED lighting, LPI at signals
NEROLY RD COR #4
22 crashes · 5 KSI · 1 fatal · 🔁 Persistent: era B 2 KSI
5 1 LPI, Bulb-outs, HV crosswalk, APS, Signal upgrade, Speed feedback signs
MAIN ST & BIG BREAK RD INT #1
8 crashes · 2 KSI · 0 fatal
2 0 LPI, Bulb-outs, HV crosswalk, APS, Signal upgrade, Ped countdown
LAUREL RD & OHARA AV INT #2
5 crashes · 2 KSI · 1 fatal
2 1 Protected LT, LPI, LED intersection lighting, HV crosswalk, APS
Citywide programs
ProgramTypeJustification (2021–2025)
LPI + APS Rollout (~22 HIN intersections) SYS 276 signal/ROW crashes (32 post-COVID KSI); LPI CMF=0.13–0.30 ped fatality reduction
LED Intersection Lighting (137 dark crashes, 23 KSI) LIGHT Dark KSI rate 15.6%→17.8%; 41.7% of ped KSI in dark; CMF=0.72 for dark crashes
Speed Feedback Signs + Road Diet Eval SPEED Unsafe Speed = #1 PCF with 120 crashes; KSI rate 7.6%→5.6%; 25 radar signs on HIN corridors
What we bring & recommended ask
Analysis basis:  SWITRS/TIMS 2015–2025 (excl. 2020) · FHWA Safe System HIN methodology · SS4A NOFO FY2026 · CCTSAP 2024 (CCTA) · Deadline: May 26, 2026
SS4A FY2026 — Recommended Implementation Grant
Multi-Corridor HIN Implementation Package
$4.6M – $13.8M federal · 80% federal / 20% local
4 HIN intersections + 3 corridor programs + 3 citywide programs. Balanced portfolio: infrastructure (LPI, LED lighting, raised median, RRFB), speed management, and behavioral programs. MAIN ST + LAUREL RD anchor projects with 26 combined KSI provide the core safety case.
CCTSAP 2024 Countywide City adoption recommended ⚡ Due May 26, 2026 SWITRS 2015–2025 +1% KSI rate
🏛️
Prior C12 projects funded ($0.54M) · BCR + SA-Ped + SA-Bike + VRU pathway
$5–18M
Portfolio potential
$0.54M
Prior HSIP won
6
Applications planned
C13 Applications open ~Fall 2026 · Prepare now
Why this application portfolio can win
C12 track record: 1 project, $0.54M funded — proven delivery
Oakley won 1 HSIP project in C12 ($0.54M) — H12-04-131. Returning applicants with delivery history score higher. Each prior award provides a direct C13 scale-up template.
Collision profile maps precisely to highest-scoring C13 categories
Dark crashes: 137 (23 KSI) → BCR Lighting (avg C12 grant $1.84M)
Speed #1 PCF: 120 crashes — KSI rate 7.6%→5.6% → BCR Speed calming
Ped: 36 (9 KSI, 25.0% rate) → VRU Special Rule bonus
Bike: 33 (9 KSI) → SA-Bike set-aside
Signal/Broadside: 276 crashes → BCR Signal+LPI
HSIP award history & statewide comparables
Oakley C12
$0.54M
1 prior project — direct C13 scale-up templates.
Long Beach C12
$9.7M
Retroreflective sign upgrade — comparable BCR scope for speed management application.
Glendale C12
$8.25M
Signal+LPI+APS citywide — model for BCR+VRU hybrid application.
Recommended C13 portfolio (2021–2025 crash data)
Application Countermeasures Category Est. range
Signal Modernization + VRU #1
140 broadside + 36 ped (9 KSI)
LPI+APS at 22 HIN intersections, Retroreflective backplates, Protected LT, Countdown signals. Builds on H12-04-131. BCR VRU+ $3–7M
Intersection LED Lighting #2
137 dark crashes (23 KSI); dark rate 15.6%→17.8%
LED at 27 HIN intersections; corridor lighting on top 3 HIN corridors; retroreflective backplates BCR $1.5–4.5M
Raised Median — MAIN ST #3
MAIN ST: 15 KSI + LAUREL RD: 11 KSI
Raised median channelization; restrict LT conflicts; ped refuge islands; Protected-permissive LT phasing BCR $2–6M
SA-PedCrossing × 2
36 ped (9 KSI); 41.7% dark KSI rate
RRFBs at unsignalized crossings on MAIN ST + LAUREL RD; curb extensions; ped refuge. SA-Ped 2 × $400K
SA-Bike Safety × 2
33 bike crashes (9 KSI); top HIN corridors
Class IV separated bike lanes on MAIN ST; bike detection at signals; green conflict zone markings. SA-Bike 2 × $360K
Speed + Retroreflective Signs
120 speed crashes (#1 PCF); KSI rate 7.6%→5.6%
Dynamic speed feedback signs (25+); raised crosswalks; retroreflective sign upgrade citywide; automated enforcement study BCR $2–6M
C13 Winning Portfolio Formula
App 1 — BCR+VRU: Signal+LPI+APS+Backplates$3–7M
App 2 — BCR: Intersection LED Lighting$1.5–4.5M
App 3 — BCR: Raised Median (MAIN ST)$2–6M
Apps 4–5 — SA-PedCrossing × 2 (different corridors)2 × $400K
Apps 6–7 — SA-Bike Safety × 2 (different corridors)2 × $360K
App 8 — BCR: Speed Mgmt + Retroreflective Signs$1.5–4M
Total C13 target: $5M – $18M · 0% local match · VRU Special Rule qualifies (69 VRU crashes, 18 KSI)
Oakley HSIP application history
Project IDCategoryAwardDescription
H12-04-131
BCR $537K LT phase+signals: Main St & Empire Ave
What we bring to this application
SWITRS/TIMS 2021–2025 1 prior HSIP wins (C12) 57 KSI · 18 fatals BCR · SA-Ped · SA-Bike · VRU