$
trafficgrants.ai
Confidential Grant Strategy Brief
City of Hercules — Federal Safety Grant
Strategy & Application Roadmap
Contra Costa County · SWITRS/TIMS 2015–2025 (excl. 2020) · City streets only · FHWA Safe System methodology · May 26, 2026 SS4A deadline
20 KSI collisions
2015–2025
2 Fatalities
city streets
-7% KSI rate
post-COVID
$0.35M Prior HSIP
awarded
$5–18M+ Combined
target portfolio
🏗️
USDOT · Implementation Grant · CCTSAP 2024 countywide action plan · Contra Costa County
$4.6–13.8M
Federal ask range
10
HIN projects identified
⚡ Application Deadline: May 26, 2026 at 5:00 PM EDT
Safety case & program alignment
-6.9% KSI rate post-COVID — Hercules' severity crisis requires urgent intervention
Hercules’s KSI rate shifted from 12.09% (2015–19) to 11.25% (2021–25) — a -6.9% change. Volume fell but each crash is significantly more likely to kill or severely injure — a severity crisis, not a volume crisis. 9 post-COVID KSI across 11 HIN corridors demand immediate targeted investment.
CCTSAP 2024 countywide action plan — Hercules-specific appendix available for adoption
CCTA adopted the Countywide Comprehensive Transportation Safety Action Plan (CCTSAP 2024) — a USDOT-eligible action plan covering all Contra Costa cities including Hercules. The CCTSAP includes a city-specific appendix for Hercules. Upon local adoption resolution and completion of the USDOT Self-Certification Worksheet, Hercules can apply for a FY2026 SS4A Implementation Grant targeting $5–12M federal.
2
Fatalities
city streets
11
HIN corridors
identified
CCTSAP 2024
Countywide
action plan
Project breakdown by category (2021–2025 crash data)
CategoryProjectsCost Est.Focus locations
HIN Intersections 4 $2.2M SAN PABLO AV & SYCAMORE A, SYCAMORE AV & REFUGIO VAL — ranked by 2021–25 KSI
Corridor Programs 3 $5.4M REFUGIO VALLEY RD, SAN PABLO AV, SYCAMORE AV — LPI + lighting + raised median
Citywide Programs 3 $1.6M LPI+APS rollout, LED intersection lighting, speed feedback
⚡ Two-step path: Adopt CCTSAP appendix + complete Self-Certification Worksheet
Step 1: City Council adopts Hercules-specific CCTSAP appendix (available from CCTA). Step 2: Complete USDOT Self-Certification Worksheet confirming CCTSAP satisfies all required action plan components. If confirmed → submit FY2026 Implementation Grant by May 26, 2026. Contact CCTA for the Hercules appendix and eligibility guidance. Recommend pre-application USDOT review (due April 24, 2026).
Priority SS4A projects — 2021–2025 crash data
Tier 1 — Fatal & high-KSI corridors (2021–2025)
LocationKSIFatalCountermeasures
REFUGIO VALLEY RD COR #1
21 crashes · 5 KSI · 0 fatal · 🔁 Persistent: era B 2 KSI
5 0 Raised median, LPI+APS all signals, LED lighting, HV crosswalks, Ped countdown signals
SAN PABLO AV COR #2
26 crashes · 3 KSI · 1 fatal · 🔁 Persistent: era B 0 KSI
3 1 HAWK beacon, Protected LT, LPI+APS, LED lighting, Ped refuge islands, RRFBs, Speed calming
SYCAMORE AV COR #3
22 crashes · 3 KSI · 1 fatal · 🔁 Persistent: era B 0 KSI
3 1 HAWK beacon, Class IV bike lanes, RRFB crossings, Ped refuge islands, LED lighting, LPI at signals
SYCAMORE AVE COR #4
10 crashes · 3 KSI · 0 fatal · ⚠️ Emerging: era B 3 KSI
3 0 LPI, Bulb-outs, HV crosswalk, APS, Signal upgrade, Speed feedback signs
SAN PABLO AV & SYCAMORE AV INT #1
4 crashes · 1 KSI · 0 fatal
1 0 LPI, Bulb-outs, HV crosswalk, APS, Signal upgrade, Ped countdown
SYCAMORE AV & REFUGIO VALLEY RD INT #2
2 crashes · 1 KSI · 0 fatal
1 0 LPI, Bulb-outs, HV crosswalk, APS, Signal upgrade, Ped countdown
Citywide programs
ProgramTypeJustification (2021–2025)
LPI + APS Rollout (~11 HIN intersections) SYS 73 signal/ROW crashes (9 post-COVID KSI); LPI CMF=0.13–0.30 ped fatality reduction
LED Intersection Lighting (49 dark crashes, 10 KSI) LIGHT Dark KSI rate 21.4%→19.0%; 21.2% of ped KSI in dark; CMF=0.72 for dark crashes
Speed Feedback Signs + Road Diet Eval SPEED Unsafe Speed = #1 PCF with 47 crashes; KSI rate 11.8%→16.7%; 25 radar signs on HIN corridors
What we bring & recommended ask
Analysis basis:  SWITRS/TIMS 2015–2025 (excl. 2020) · FHWA Safe System HIN methodology · SS4A NOFO FY2026 · CCTSAP 2024 (CCTA) · Deadline: May 26, 2026
SS4A FY2026 — Recommended Implementation Grant
Multi-Corridor HIN Implementation Package
$4.6M – $13.8M federal · 80% federal / 20% local
4 HIN intersections + 3 corridor programs + 3 citywide programs. Balanced portfolio: infrastructure (LPI, LED lighting, raised median, RRFB), speed management, and behavioral programs. REFUGIO VALLEY RD + SAN PABLO AV anchor projects with 8 combined KSI provide the core safety case.
CCTSAP 2024 Countywide City adoption recommended ⚡ Due May 26, 2026 SWITRS 2015–2025 -7% KSI rate
🏛️
Prior C12 projects funded ($0.35M) · BCR + SA-Ped + SA-Bike + VRU pathway
$5–18M
Portfolio potential
$0.35M
Prior HSIP won
6
Applications planned
C13 Applications open ~Fall 2026 · Prepare now
Why this application portfolio can win
C12 track record: 1 project, $0.35M funded — proven delivery
Hercules won 1 HSIP project in C12 ($0.35M) — H12-04-161. Returning applicants with delivery history score higher. Each prior award provides a direct C13 scale-up template.
Collision profile maps precisely to highest-scoring C13 categories
Dark crashes: 49 (10 KSI) → BCR Lighting (avg C12 grant $1.84M)
Speed #1 PCF: 47 crashes — KSI rate 11.8%→16.7% → BCR Speed calming
Ped: 33 (7 KSI, 21.2% rate) → VRU Special Rule bonus
Bike: 11 (3 KSI) → SA-Bike set-aside
Signal/Broadside: 73 crashes → BCR Signal+LPI
HSIP award history & statewide comparables
Hercules C12
$0.35M
1 prior project — direct C13 scale-up templates.
Long Beach C12
$9.7M
Retroreflective sign upgrade — comparable BCR scope for speed management application.
Glendale C12
$8.25M
Signal+LPI+APS citywide — model for BCR+VRU hybrid application.
Recommended C13 portfolio (2021–2025 crash data)
Application Countermeasures Category Est. range
Signal Modernization + VRU #1
34 broadside + 33 ped (7 KSI)
LPI+APS at 11 HIN intersections, Retroreflective backplates, Protected LT, Countdown signals. Builds on H12-04-161. BCR VRU+ $3–7M
Intersection LED Lighting #2
49 dark crashes (10 KSI); dark rate 21.4%→19.0%
LED at 9 HIN intersections; corridor lighting on top 3 HIN corridors; retroreflective backplates BCR $1.5–4.5M
Raised Median — REFUGIO VALLEY RD #3
REFUGIO VALLEY RD: 5 KSI + SAN PABLO AV: 3 KSI
Raised median channelization; restrict LT conflicts; ped refuge islands; Protected-permissive LT phasing BCR $2–6M
SA-PedCrossing × 2
33 ped (7 KSI); 21.2% dark KSI rate
RRFBs at unsignalized crossings on REFUGIO VALLEY + SAN PABLO AV; curb extensions; ped refuge. SA-Ped 2 × $400K
SA-Bike Safety × 2
11 bike crashes (3 KSI); top HIN corridors
Class IV separated bike lanes on REFUGIO VALLEY ; bike detection at signals; green conflict zone markings. SA-Bike 2 × $360K
Speed + Retroreflective Signs
47 speed crashes (#1 PCF); KSI rate 11.8%→16.7%
Dynamic speed feedback signs (25+); raised crosswalks; retroreflective sign upgrade citywide; automated enforcement study BCR $2–6M
C13 Winning Portfolio Formula
App 1 — BCR+VRU: Signal+LPI+APS+Backplates$3–7M
App 2 — BCR: Intersection LED Lighting$1.5–4.5M
App 3 — BCR: Raised Median (REFUGIO VALLEY RD)$2–6M
Apps 4–5 — SA-PedCrossing × 2 (different corridors)2 × $400K
Apps 6–7 — SA-Bike Safety × 2 (different corridors)2 × $360K
App 8 — BCR: Speed Mgmt + Retroreflective Signs$1.5–4M
Total C13 target: $5M – $18M · 0% local match · VRU Special Rule qualifies (44 VRU crashes, 10 KSI)
Hercules HSIP application history
Project IDCategoryAwardDescription
H12-04-161
BCR $346K LPI+APS+countdown: Refugio Valley Rd
What we bring to this application
SWITRS/TIMS 2021–2025 1 prior HSIP wins (C12) 20 KSI · 2 fatals BCR · SA-Ped · SA-Bike · VRU