$
trafficgrants.ai
Confidential Grant Strategy Brief
City of El Cerrito — Federal Safety Grant
Strategy & Application Roadmap
Contra Costa County · SWITRS/TIMS 2015–2025 (excl. 2020) · City streets only · FHWA Safe System methodology · May 26, 2026 SS4A deadline
21 KSI collisions
2015–2025
1 Fatalities
city streets
-2% KSI rate
post-COVID
$0.54M Prior HSIP
awarded
$5–18M+ Combined
target portfolio
🏗️
USDOT · Implementation Grant · CCTSAP 2024 countywide action plan · Contra Costa County
$4.5–13.3M
Federal ask range
9
HIN projects identified
⚡ Application Deadline: May 26, 2026 at 5:00 PM EDT
Safety case & program alignment
-1.9% KSI rate post-COVID — El Cerrito's severity crisis requires urgent intervention
El Cerrito’s KSI rate shifted from 10.1% (2015–19) to 9.91% (2021–25) — a -1.9% change. Both volume and severity are rising — compounding the safety challenge. 11 post-COVID KSI across 19 HIN corridors demand immediate targeted investment.
CCTSAP 2024 countywide action plan — El Cerrito-specific appendix available for adoption
CCTA adopted the Countywide Comprehensive Transportation Safety Action Plan (CCTSAP 2024) — a USDOT-eligible action plan covering all Contra Costa cities including El Cerrito. The CCTSAP includes a city-specific appendix for El Cerrito. Upon local adoption resolution and completion of the USDOT Self-Certification Worksheet, El Cerrito can apply for a FY2026 SS4A Implementation Grant targeting $5–12M federal.
1
Fatalities
city streets
19
HIN corridors
identified
CCTSAP 2024
Countywide
action plan
Project breakdown by category (2021–2025 crash data)
CategoryProjectsCost Est.Focus locations
HIN Intersections 4 $2.2M CENTRAL AV & OHLONE GREEN, CENTRAL AV & CARLSON BL — ranked by 2021–25 KSI
Corridor Programs 3 $5.4M POTRERO AV, SAN PABLO AV, ARLINGTON BL — LPI + lighting + raised median
Citywide Programs 2 $1.3M LPI+APS rollout, LED intersection lighting,
⚡ Two-step path: Adopt CCTSAP appendix + complete Self-Certification Worksheet
Step 1: City Council adopts El Cerrito-specific CCTSAP appendix (available from CCTA). Step 2: Complete USDOT Self-Certification Worksheet confirming CCTSAP satisfies all required action plan components. If confirmed → submit FY2026 Implementation Grant by May 26, 2026. Contact CCTA for the El Cerrito appendix and eligibility guidance. Recommend pre-application USDOT review (due April 24, 2026).
Priority SS4A projects — 2021–2025 crash data
Tier 1 — Fatal & high-KSI corridors (2021–2025)
LocationKSIFatalCountermeasures
POTRERO AV COR #1
17 crashes · 2 KSI · 0 fatal · 🔁 Persistent: era B 1 KSI
2 0 Raised median, LPI+APS all signals, LED lighting, HV crosswalks, Ped countdown signals
SAN PABLO AV COR #2
22 crashes · 2 KSI · 1 fatal · 🔁 Persistent: era B 0 KSI
2 1 HAWK beacon, Protected LT, LPI+APS, LED lighting, Ped refuge islands, RRFBs, Speed calming
ARLINGTON BL COR #3
14 crashes · 1 KSI · 0 fatal · ⚠️ Emerging: era B 1 KSI
1 0 Class IV bike lanes, RRFB crossings, Ped refuge islands, LED lighting, LPI at signals
CENTRAL AV COR #4
26 crashes · 1 KSI · 0 fatal · 🔁 Persistent: era B 0 KSI
1 0 LPI, Bulb-outs, HV crosswalk, APS, Signal upgrade, Speed feedback signs
CENTRAL AV & OHLONE GREENWAY INT #1
6 crashes · 0 KSI · 0 fatal
0 0 LPI, Bulb-outs, HV crosswalk, APS, Signal upgrade, Ped countdown
CENTRAL AV & CARLSON BL INT #2
5 crashes · 0 KSI · 0 fatal
0 0 LPI, Bulb-outs, HV crosswalk, APS, Signal upgrade, Ped countdown
Citywide programs
ProgramTypeJustification (2021–2025)
LPI + APS Rollout (~19 HIN intersections) SYS 106 signal/ROW crashes (11 post-COVID KSI); LPI CMF=0.13–0.30 ped fatality reduction
LED Intersection Lighting (44 dark crashes, 6 KSI) LIGHT Dark KSI rate 17.4%→9.5%; 38.8% of ped KSI in dark; CMF=0.72 for dark crashes
What we bring & recommended ask
Analysis basis:  SWITRS/TIMS 2015–2025 (excl. 2020) · FHWA Safe System HIN methodology · SS4A NOFO FY2026 · CCTSAP 2024 (CCTA) · Deadline: May 26, 2026
SS4A FY2026 — Recommended Implementation Grant
Multi-Corridor HIN Implementation Package
$4.5M – $13.3M federal · 80% federal / 20% local
4 HIN intersections + 3 corridor programs + 2 citywide programs. Balanced portfolio: infrastructure (LPI, LED lighting, raised median, RRFB), speed management, and behavioral programs. POTRERO AV + SAN PABLO AV anchor projects with 4 combined KSI provide the core safety case.
CCTSAP 2024 Countywide City adoption recommended ⚡ Due May 26, 2026 SWITRS 2015–2025 -2% KSI rate
🏛️
Prior C12 projects funded ($0.54M) · BCR + SA-Ped + SA-Bike + VRU pathway
$5–18M
Portfolio potential
$0.54M
Prior HSIP won
5
Applications planned
C13 Applications open ~Fall 2026 · Prepare now
Why this application portfolio can win
C12 track record: 1 project, $0.54M funded — proven delivery
El Cerrito won 1 HSIP project in C12 ($0.54M) — H12-04-141. Returning applicants with delivery history score higher. Each prior award provides a direct C13 scale-up template.
Collision profile maps precisely to highest-scoring C13 categories
Dark crashes: 44 (6 KSI) → BCR Lighting (avg C12 grant $1.84M)
Ped: 49 (8 KSI, 16.3% rate) → VRU Special Rule bonus
Bike: 46 (7 KSI) → SA-Bike set-aside
Signal/Broadside: 106 crashes → BCR Signal+LPI
HSIP award history & statewide comparables
El Cerrito C12
$0.54M
1 prior project — direct C13 scale-up templates.
Long Beach C12
$9.7M
Retroreflective sign upgrade — comparable BCR scope for speed management application.
Glendale C12
$8.25M
Signal+LPI+APS citywide — model for BCR+VRU hybrid application.
Recommended C13 portfolio (2021–2025 crash data)
Application Countermeasures Category Est. range
Signal Modernization + VRU #1
76 broadside + 49 ped (8 KSI)
LPI+APS at 19 HIN intersections, Retroreflective backplates, Protected LT, Countdown signals. Builds on H12-04-141. BCR VRU+ $3–7M
Intersection LED Lighting #2
44 dark crashes (6 KSI); dark rate 17.4%→9.5%
LED at 8 HIN intersections; corridor lighting on top 3 HIN corridors; retroreflective backplates BCR $1.5–4.5M
Raised Median — POTRERO AV #3
POTRERO AV: 2 KSI + SAN PABLO AV: 2 KSI
Raised median channelization; restrict LT conflicts; ped refuge islands; Protected-permissive LT phasing BCR $2–6M
SA-PedCrossing × 2
49 ped (8 KSI); 38.8% dark KSI rate
RRFBs at unsignalized crossings on POTRERO AV + SAN PABLO AV; curb extensions; ped refuge. SA-Ped 2 × $400K
SA-Bike Safety × 2
46 bike crashes (7 KSI); top HIN corridors
Class IV separated bike lanes on POTRERO AV; bike detection at signals; green conflict zone markings. SA-Bike 2 × $360K
Motorcycle Safety + LED Lighting
8 motorcycle crashes (2 KSI, 25.0% KSI rate)
LED at motorcycle crash nodes; speed feedback signs on HIN corridors; advanced stop bars; skid-resistant pavement BCR $800K–3M
C13 Winning Portfolio Formula
App 1 — BCR+VRU: Signal+LPI+APS+Backplates$3–7M
App 2 — BCR: Intersection LED Lighting$1.5–4.5M
App 3 — BCR: Raised Median (POTRERO AV)$2–6M
Apps 4–5 — SA-PedCrossing × 2 (different corridors)2 × $400K
Apps 6–7 — SA-Bike Safety × 2 (different corridors)2 × $360K
Total C13 target: $5M – $18M · 0% local match · VRU Special Rule qualifies (95 VRU crashes, 15 KSI)
El Cerrito HSIP application history
Project IDCategoryAwardDescription
H12-04-141
BCR $537K Signals+APS: San Pablo Ave & Potrero Ave
What we bring to this application
SWITRS/TIMS 2021–2025 1 prior HSIP wins (C12) 21 KSI · 1 fatals BCR · SA-Ped · SA-Bike · VRU