123 KSI collisions
2015–2025
10 Fatalities
city streets
+73% KSI rate
post-COVID
$1.10M Prior HSIP
awarded
$5–18M+ Combined
target portfolio
🏗️
USDOT · Implementation Grant · CCTSAP 2024 countywide action plan · Contra Costa County
$5.1–15.3M
Federal ask range
11
HIN projects identified
⚡ Application Deadline: May 26, 2026 at 5:00 PM EDT
Safety case & program alignment
+73.3% KSI rate post-COVID — Brentwood's severity crisis requires urgent intervention
Brentwood’s KSI rate shifted from 6.93% (2015–19) to 12.01% (2021–25) — a +73.3% increase. Volume fell but each crash is significantly more likely to kill or severely injure — a severity crisis, not a volume crisis. 77 post-COVID KSI across 48 HIN corridors demand immediate targeted investment.
CCTSAP 2024 countywide action plan — Brentwood-specific appendix available for adoption
CCTA adopted the Countywide Comprehensive Transportation Safety Action Plan (CCTSAP 2024) — a USDOT-eligible action plan covering all Contra Costa cities including Brentwood. The CCTSAP includes a city-specific appendix for Brentwood. Upon local adoption resolution and completion of the USDOT Self-Certification Worksheet, Brentwood can apply for a FY2026 SS4A Implementation Grant targeting $5–12M federal.
10
Fatalities
city streets
48
HIN corridors
identified
CCTSAP 2024
Countywide
action plan
Project breakdown by category (2021–2025 crash data)
CategoryProjectsCost Est.Focus locations
HIN Intersections 4 $2.2M OHARA AV & LONE TREE WY, BALFOUR RD & GUISE WY — ranked by 2021–25 KSI
Corridor Programs 3 $6.1M BRENTWOOD BL, BALFOUR RD, SAND CREEK RD — LPI + lighting + raised median
Citywide Programs 4 $1.9M LPI+APS rollout, LED intersection lighting, speed feedback DUI enforcement
⚡ Two-step path: Adopt CCTSAP appendix + complete Self-Certification Worksheet
Step 1: City Council adopts Brentwood-specific CCTSAP appendix (available from CCTA). Step 2: Complete USDOT Self-Certification Worksheet confirming CCTSAP satisfies all required action plan components. If confirmed → submit FY2026 Implementation Grant by May 26, 2026. Contact CCTA for the Brentwood appendix and eligibility guidance. Recommend pre-application USDOT review (due April 24, 2026).
Priority SS4A projects — 2021–2025 crash data
Tier 1 — Fatal & high-KSI corridors (2021–2025)
LocationKSIFatalCountermeasures
BRENTWOOD BL COR #1
183 crashes · 21 KSI · 2 fatal · 📈 Worsening: era B 14 KSI
21 2 HAWK beacon, Raised median, LPI+APS all signals, LED lighting, HV crosswalks, Ped countdown signals
BALFOUR RD COR #2
250 crashes · 16 KSI · 0 fatal · 📈 Worsening: era B 11 KSI
16 0 HAWK beacon, Protected LT, LPI+APS, LED lighting, Ped refuge islands, RRFBs, Speed calming
SAND CREEK RD COR #3
119 crashes · 12 KSI · 1 fatal · 📈 Worsening: era B 8 KSI
12 1 HAWK beacon, Class IV bike lanes, RRFB crossings, Ped refuge islands, LED lighting, LPI at signals
LONE TREE WY COR #4
86 crashes · 7 KSI · 0 fatal · 🔁 Persistent: era B 3 KSI
7 0 LPI, Bulb-outs, HV crosswalk, APS, Signal upgrade, Speed feedback signs
OHARA AV & LONE TREE WY INT #1
7 crashes · 2 KSI · 0 fatal
2 0 LPI, Bulb-outs, HV crosswalk, APS, Signal upgrade, Ped countdown
BALFOUR RD & GUISE WY INT #2
3 crashes · 2 KSI · 0 fatal
2 0 LPI, Bulb-outs, HV crosswalk, APS, Signal upgrade, Ped countdown
Citywide programs
ProgramTypeJustification (2021–2025)
LPI + APS Rollout (~22 HIN intersections) SYS 752 signal/ROW crashes (77 post-COVID KSI); LPI CMF=0.13–0.30 ped fatality reduction
LED Intersection Lighting (349 dark crashes, 47 KSI) LIGHT Dark KSI rate 13.9%→13.0%; 24.0% of ped KSI in dark; CMF=0.72 for dark crashes
Speed Feedback Signs + Road Diet Eval SPEED Unsafe Speed = #1 PCF with 409 crashes; KSI rate 6.4%→8.4%; 25 radar signs on HIN corridors
DUI Enforcement + Safe Routes Outreach BEH 133 alcohol crashes (30 KSI, 22.6% rate); 2.9× multiplier; Fri–Sun 9PM+ highest risk window
What we bring & recommended ask
Analysis basis:  SWITRS/TIMS 2015–2025 (excl. 2020) · FHWA Safe System HIN methodology · SS4A NOFO FY2026 · CCTSAP 2024 (CCTA) · Deadline: May 26, 2026
SS4A FY2026 — Recommended Implementation Grant
Multi-Corridor HIN Implementation Package
$5.1M – $15.3M federal · 80% federal / 20% local
4 HIN intersections + 3 corridor programs + 4 citywide programs. Balanced portfolio: infrastructure (LPI, LED lighting, raised median, RRFB), speed management, and behavioral programs. BRENTWOOD BL + BALFOUR RD anchor projects with 37 combined KSI provide the core safety case.
CCTSAP 2024 Countywide City adoption recommended ⚡ Due May 26, 2026 SWITRS 2015–2025 +73% KSI rate
🏛️
Prior C12 projects funded ($1.10M) · BCR + SA-Ped + SA-Bike + VRU pathway
$5–18M
Portfolio potential
$1.10M
Prior HSIP won
6
Applications planned
C13 Applications open ~Fall 2026 · Prepare now
Why this application portfolio can win
C12 track record: 1 project, $1.10M funded — proven delivery
Brentwood won 1 HSIP project in C12 ($1.10M) — H12-04-081. Returning applicants with delivery history score higher. Each prior award provides a direct C13 scale-up template.
Collision profile maps precisely to highest-scoring C13 categories
Dark crashes: 349 (47 KSI) → BCR Lighting (avg C12 grant $1.84M)
Speed #1 PCF: 409 crashes — KSI rate 6.4%→8.4% → BCR Speed calming
Ped: 96 (14 KSI, 14.6% rate) → VRU Special Rule bonus
Bike: 105 (13 KSI) → SA-Bike set-aside
Signal/Broadside: 752 crashes → BCR Signal+LPI
HSIP award history & statewide comparables
Brentwood C12
$1.10M
1 prior project — direct C13 scale-up templates.
Long Beach C12
$9.7M
Retroreflective sign upgrade — comparable BCR scope for speed management application.
Glendale C12
$8.25M
Signal+LPI+APS citywide — model for BCR+VRU hybrid application.
Recommended C13 portfolio (2021–2025 crash data)
Application Countermeasures Category Est. range
Signal Modernization + VRU #1
360 broadside + 96 ped (14 KSI)
LPI+APS at 22 HIN intersections, Retroreflective backplates, Protected LT, Countdown signals. Builds on H12-04-081. BCR VRU+ $3–7M
Intersection LED Lighting #2
349 dark crashes (47 KSI); dark rate 13.9%→13.0%
LED at 28 HIN intersections; corridor lighting on top 3 HIN corridors; retroreflective backplates BCR $1.5–4.5M
Raised Median — BRENTWOOD BL #3
BRENTWOOD BL: 21 KSI + BALFOUR RD: 16 KSI
Raised median channelization; restrict LT conflicts; ped refuge islands; Protected-permissive LT phasing BCR $3–7M
SA-PedCrossing × 2
96 ped (14 KSI); 24.0% dark KSI rate
RRFBs at unsignalized crossings on BRENTWOOD BL + BALFOUR RD; curb extensions; ped refuge. SA-Ped 2 × $400K
SA-Bike Safety × 2
105 bike crashes (13 KSI); top HIN corridors
Class IV separated bike lanes on BRENTWOOD BL; bike detection at signals; green conflict zone markings. SA-Bike 2 × $360K
Speed + Retroreflective Signs
409 speed crashes (#1 PCF); KSI rate 6.4%→8.4%
Dynamic speed feedback signs (25+); raised crosswalks; retroreflective sign upgrade citywide; automated enforcement study BCR $2–6M
C13 Winning Portfolio Formula
App 1 — BCR+VRU: Signal+LPI+APS+Backplates$3–7M
App 2 — BCR: Intersection LED Lighting$1.5–4.5M
App 3 — BCR: Raised Median (BRENTWOOD BL)$3–7M
Apps 4–5 — SA-PedCrossing × 2 (different corridors)2 × $400K
Apps 6–7 — SA-Bike Safety × 2 (different corridors)2 × $360K
App 8 — BCR: Speed Mgmt + Retroreflective Signs$1.5–4M
Total C13 target: $5M – $18M · 0% local match · VRU Special Rule qualifies (201 VRU crashes, 27 KSI)
Brentwood HSIP application history
Project IDCategoryAwardDescription
H12-04-081
BCR $1.1M Signals+LPI+APS: Brentwood Blvd & Balfour Rd
What we bring to this application
SWITRS/TIMS 2021–2025 1 prior HSIP wins (C12) 123 KSI · 10 fatals BCR · SA-Ped · SA-Bike · VRU